Studio 3A

DS - Housing

Sustainability strategies

Refurbishment of existing building and garden with sustainable materials such as lime-wash paint and thermally treated wood. Increasing thermal efficiency by insulating the roof, installing double glazing, underfloor heating with insulated hot water pipes, and creation of natural cross ventilation.
Recycling existing glass brick wall to create an outside bar area. All new equipment installed is suggested to be at least grade B on the new EU energy certificate.

2022

London, United Kingdom

410 square meters of refurbishment

Under construction